Circulation cooling filter units
Recirculation cooler filtration units (UKF) are compact systems made up of boost pump, filter and plate heat exchanger for offline cooling-filtration circuits. The continuous cooling and filtration in the bypass flow can significantly increase the service life of the oil and the hydraulic system.
- Constant temperature (independent of the cycle times of the hydraulic system)
- Uniform supply quantities
- Avoidance of pressure surges in the heat exchanger
- Filter element replacement without shutting down the hydraulic system
Cooling and lubrication of gears
UKF with gear pump, duplex filter and plate heat exchanger.
The thermal bypass valve ensures that the system can start up even at lower temperatures.
In order to ensure a constant oil temperature, a closed-loop water volume controller can also be installed. This controller ensures that only the volume of water required to achieve the desired oil temperature is fed to the plate heat exchanger.
Ready for dispatch within 48 hours of order confirmation. Express surcharge is 10% of the order value, but with a minimum of ?25. Please always order express products in a separate order - mixed shipping (express and regular) is not possible.
|
|
UKF-1/2.0/P/7/0.55/615-20/MF180/3/D
Material no. 4649062
Deliverable within ca. -
days
Request replacement time
loading...
The replacement time depends on the product quantity.
|
|
||||||
|
|
UKF-1/2.0/P/7/0.55/615-20/MF180/3/LZ
Material no. 4639740
Deliverable within ca. -
days
Request replacement time
loading...
The replacement time depends on the product quantity.
|
|
||||||
|
|
UKF-1/2.0/V/10/0.55/615-20/MF180/3/D
Material no. 3737114
Deliverable within ca. -
days
Request replacement time
loading...
The replacement time depends on the product quantity.
|
|
||||||
|
|
UKF-1/3.0/P+V/ 5/0.55/615-20/MF180/20/BM
Material no. 3548718
Deliverable within ca. -
days
Request replacement time
loading...
The replacement time depends on the product quantity.
|
|
||||||
|
|
UKF-1/5.2/P+V/10/0.55/610-20/FLND160/10D
Material no. 4262258
Deliverable within ca. -
days
Request replacement time
loading...
The replacement time depends on the product quantity.
|
|
||||||
|
|
UKF-1/5.2/P+V/10/0.55/615-30/HFM75/10/BM
Material no. 3894347
Deliverable within ca. -
days
Request replacement time
loading...
The replacement time depends on the product quantity.
|
|
||||||
|
|
UKF-1/5.2/P+V/10/1.5/615-50/FLND160/25B
Material no. 4027070
Deliverable within ca. -
days
Request replacement time
loading...
The replacement time depends on the product quantity.
|
|
||||||
|
|
UKF-1/5.2/P+V/10/1.5/615-50/HFM75/20/BM
Material no. 4251159
Deliverable within ca. -
days
Request replacement time
loading...
The replacement time depends on the product quantity.
|
|
||||||
|
|
UKF-1/5.2/P+V/2/0.55-6/615-20/HFM75/20
Material no. 4491070
Deliverable within ca. -
days
Request replacement time
loading...
The replacement time depends on the product quantity.
|
|
||||||
|
|
UKF-1/5.2/P+V/4/0.55-6/610-10HFM75/20/BM
Material no. 3840291
Deliverable within ca. -
days
Request replacement time
loading...
The replacement time depends on the product quantity.
|
|
||||||
|
|
UKF-1/5.2/P+V/4/0.55-6/615-10/HFM75/20/*
Material no. 3673853
Deliverable within ca. -
days
Request replacement time
loading...
The replacement time depends on the product quantity.
|
|
||||||
|
|
UKF-1/5.2/P+V/4/0.55-6/615-30/HFM75/20/D
Material no. 4347250
Deliverable within ca. -
days
Request replacement time
loading...
The replacement time depends on the product quantity.
|
|
||||||
|
|
UKF-1/5.2/P+V/4/0.55/610-10/HFM75/20/BM
Material no. 3840287
Deliverable within ca. -
days
Request replacement time
loading...
The replacement time depends on the product quantity.
|
|
||||||
|
|
UKF-1/5.2/P+V/4/0.55/610-20/HFM75/10/BM*
Material no. 3660248
Deliverable within ca. -
days
Request replacement time
loading...
The replacement time depends on the product quantity.
|
|
||||||
|
|
UKF-1/5.2/P+V/4/0.55/610-20/HFM75/10/D
Material no. 4618086
Deliverable within ca. -
days
Request replacement time
loading...
The replacement time depends on the product quantity.
|
|
||||||
|
|
UKF-1/5.2/P+V/4/0.55/610-20/HFM75/20/BM
Material no. 3657028
Deliverable within ca. -
days
Request replacement time
loading...
The replacement time depends on the product quantity.
|
|
||||||
|
|
UKF-1/5.2/P+V/4/0.55/610-40/HFM75/20/BM
Material no. 4254842
Deliverable within ca. -
days
Request replacement time
loading...
The replacement time depends on the product quantity.
|
|
||||||
|
|
UKF-1/5.2/P+V/4/0.55j/615-10/HFM75/20/BM
Material no. 3662394
Deliverable within ca. -
days
Request replacement time
loading...
The replacement time depends on the product quantity.
|
|
||||||
|
|
UKF-1/5.2/P+V/5/0.55/615-20/HFM75/20/BM
Material no. 3873283
Deliverable within ca. -
days
Request replacement time
loading...
The replacement time depends on the product quantity.
|
|
||||||
|
|
UKF-1/5.2/P+V/5/0.55/615-20/HFM75/20/D
Material no. 4822349
Deliverable within ca. -
days
Request replacement time
loading...
The replacement time depends on the product quantity.
|
|
||||||
- Page Previous
-
Products 121-140 of 596
- Page Next